Preliminary grading of the townhome pad sites and the streets.

Sewer line and manhole installation.

Lime application for the subgrade starting at the entrance.

Pouring one side of the street in the photos above and below.

Our multi-ton rock formation is ready and waiting on the arrival of our seven foot bronze mountain lion which will be seen climbing on the rocks.  Along with the entryway, this area, at the corner of Kelly Elliott and Green Oaks, will be the focal point of the development of The Preserve on Kelly Elliott.